SportTelegraaf
Britten ’mikpunt van spot’ door miljardentegenvaller in kosten hogesnelheidstrein
The HS2 High-Speed railway construction site at Old Oak Common in London, UK, on Thursday, May 29, 2025. Costs attached to the rail project, which was originally designed to link London to Manchester and Leeds, via Birmingham, had risen to as much as 98 billion ($128 billion) by 2020, up from an initial estimate of 37.5 billion for the entire network. Photographer: Jaimi Joy/Bloomberg
Je gaat naar de website van de uitgever. Hier tonen we alleen een korte intro.